{"id":26657,"date":"2022-11-10T23:02:44","date_gmt":"2022-11-10T20:02:44","guid":{"rendered":"https:\/\/www.oitchau.com.br\/blog\/?p=26657"},"modified":"2024-08-26T22:54:31","modified_gmt":"2024-08-26T19:54:31","slug":"gestao-agil-de-projetos","status":"publish","type":"post","link":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/","title":{"rendered":"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">A gest\u00e3o \u00e1gil de projetos \u00e9 uma maneira especial de executar e gerenciar o desenvolvimento de novos projetos nas empresas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">O foco dela \u00e9 a flexibilidade, a integra\u00e7\u00e3o, a rapidez e a din\u00e2mica. Aqui, deixa-se de lado o conceito de que a defini\u00e7\u00e3o do projeto ocorre, inteiramente, antes de sua execu\u00e7\u00e3o.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Mas como ela funciona e quais s\u00e3o as suas caracter\u00edsticas? Para saber isso e como a gest\u00e3o \u00e1gil pode ajudar a sua empresa, continue lendo, veja seus benef\u00edcios e como us\u00e1-la.<\/span><\/p>\n<h2><strong>O que \u00e9 gest\u00e3o \u00e1gil de projetos?<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">Este \u00e9 o tipo de gest\u00e3o de projetos que envolve integra\u00e7\u00e3o, flexibilidade e agilidade na execu\u00e7\u00e3o.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Portanto, n\u00e3o diz respeito apenas ao menor tempo de execu\u00e7\u00e3o, mas \u00e0 possibilidade de adaptar o projeto em meio ao seu desenvolvimento.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Este tipo de gest\u00e3o se popularizou no mundo por meio da Toyota. A atua\u00e7\u00e3o desta empresa entendeu que a interven\u00e7\u00e3o no projeto era melhor do que abandon\u00e1-lo para come\u00e7ar do zero.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Com isso, tornou-se poss\u00edvel adaptar os projetos \u00e0s necessidades que se apresentassem em meio ao seu desenvolvimento.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ou, ent\u00e3o, corrigir erros que n\u00e3o foram previstos anteriormente e que surgiram ao longo da execu\u00e7\u00e3o.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Nesse caso, deixam-se de lado as entregas \u00fanicas para se abra\u00e7ar as entregas constantes e etapas menores.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Isso ajuda a manter a gest\u00e3o \u00e1gil, ao mesmo tempo em que facilita a mudan\u00e7a de rumos em meio do projeto, em si.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As etapas menores s\u00e3o aqui chamadas de \u201citera\u00e7\u00e3o\u201d e costumam ter dura\u00e7\u00e3o de 2 a 4 semanas. Ao final de cada uma delas, as prioridades do projeto s\u00e3o revistas.<\/span><\/p>\n<h3><strong>Manifesto Para Desenvolvimento \u00c1gil de Software<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">Embora a metodologia de gest\u00e3o \u00e1gil de projetos n\u00e3o seja exclusiva da \u00e1rea de TI e do desenvolvimento de softwares, ela segue princ\u00edpios que se originaram nesse nicho.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Esses princ\u00edpios comp\u00f5em o Manifesto para Desenvolvimento \u00c1gil de Software, que voc\u00ea pode <\/span><a href=\"https:\/\/agilemanifesto.org\/iso\/ptpt\/manifesto.html\"><span style=\"font-weight: 400;\">conferir aqui<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ele \u00e9 um compilado de regras e determina\u00e7\u00f5es que permitem um bom e eficiente gerenciamento \u00e1gil. Ali\u00e1s, todos s\u00e3o aplic\u00e1veis em todos os nichos, n\u00e3o apenas no TI.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Confira alguns destes princ\u00edpios:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A prioridade \u00e9 satisfazer clientes pela entrega cont\u00ednua e antecipada;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mudan\u00e7as s\u00e3o bem-vindas em meio ao projeto e trazem vantagens competitivas;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Os projetos devem envolver colaboradores engajados e que tenham suporte e ambiente necess\u00e1rios para o desenvolvimento das atividades;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Projetos \u00e1geis t\u00eam ritmo constante e s\u00e3o capazes de se sustentar, etc.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Portanto, \u00e9 comum que as regras contidas neste manifesto sejam adaptadas para o uso da gest\u00e3o \u00e1gil em outras \u00e1reas.<\/span><\/p>\n<h3><strong>Principais caracter\u00edsticas da gest\u00e3o \u00e1gil<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">Esse tipo de gest\u00e3o possui algumas caracter\u00edsticas bem marcadas. S\u00e3o elas:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Entrega dos projetos em partes, com v\u00e1rias datas de entregas diversas;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">O projeto foca em diversas atividades simultaneamente;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">As altera\u00e7\u00f5es s\u00e3o aplicadas sempre que necess\u00e1rio, pois h\u00e1 o entendimento de que mais vale adaptar o projeto do que abandon\u00e1-lo para iniciar outro do zero;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Planejamento iterativo.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Para entender como esse tipo de gest\u00e3o se diferencia da tradicional, confira as caracter\u00edsticas desta \u00faltima:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Condensa\u00e7\u00e3o das entregas em uma s\u00f3;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Foco em uma atividade por vez;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Poucas altera\u00e7\u00f5es no curso do desenvolvimento do projeto;<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Todo o planejamento ocorre de uma vez, antes do in\u00edcio da execu\u00e7\u00e3o do projeto.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Portanto, fica clara a diferen\u00e7a entre a gest\u00e3o \u00e1gil de projetos e a tradicional. Enquanto a primeira d\u00e1 mais espa\u00e7o \u00e0s equipes, a segunda \u00e9 bastante engessada.<\/span><\/p>\n<h2><strong>Quais s\u00e3o os benef\u00edcios da gest\u00e3o \u00e1gil de projetos?<\/strong><\/h2>\n\n\t\t<!--HubSpot Call-to-Action Code -->\n\t\t<span class=\"hs-cta-wrapper\" id=\"hs-cta-wrapper-87190347-c414-4d3f-8646-18211b103ff9\">\n\t\t<span class=\"hs-cta-node hs-cta-87190347-c414-4d3f-8646-18211b103ff9\" id=\"87190347-c414-4d3f-8646-18211b103ff9\">\n\t\t<!--[if lte IE 8]>\n\t\t<div id=\"hs-cta-ie-element\"><\/div>\n\t\t<![endif]-->\n\t\t<a href=\"https:\/\/cta-redirect.hubspot.com\/cta\/redirect\/20984162\/87190347-c414-4d3f-8646-18211b103ff9\" >\n\t\t<img decoding=\"async\" class=\"hs-cta-img\" id=\"hs-cta-img-87190347-c414-4d3f-8646-18211b103ff9\" style=\"border-width:0px;\" src=\"https:\/\/no-cache.hubspot.com\/cta\/default\/20984162\/87190347-c414-4d3f-8646-18211b103ff9.png\"  alt=\"New call-to-action\"\/>\n\t\t<\/a>\n\t\t<\/span>\n\t\t<script charset=\"utf-8\" src=\"\/\/js.hubspot.com\/cta\/current.js\"><\/script>\n\t\t<script>\n\t\thbspt.cta.load(20984162, '87190347-c414-4d3f-8646-18211b103ff9', {});\n\t\t<\/script>\n\t\t<\/span>\n\t\t<!-- end HubSpot Call-to-Action Code -->\n\t\t\n<p><span style=\"font-weight: 400;\">Uma das grandes vantagens da gest\u00e3o \u00e1gil \u00e9 que ela permite a aplica\u00e7\u00e3o de mudan\u00e7as no projeto, em meio \u00e0 execu\u00e7\u00e3o dele, sem que isso afete sua qualidade.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Pelo contr\u00e1rio! Esse m\u00e9todo de gest\u00e3o auxilia a equipe a reconhecer problemas, lidar com eles e dar continuidade ao projeto.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Por ser menos engessado, nada impede que haja a rean\u00e1lise dos pontos do projeto e a decis\u00e3o por mudan\u00e7as em alguns deles.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Desse modo, a empresa n\u00e3o desperdi\u00e7a recursos, pois continua utilizando-os de maneira adaptada.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Igualmente, pode aproveitar atividades at\u00e9 ent\u00e3o executadas, sem que o tempo empenhado nelas tenha sido em v\u00e3o.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Outro ponto interessante \u00e9 que esse tipo de gest\u00e3o \u00e1gil de projetos tamb\u00e9m d\u00e1 uma vis\u00e3o mais ampla do projeto.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Uma vez que ele apresenta etapas menores e entregas constantes (e n\u00e3o \u00fanica) tamb\u00e9m \u00e9 poss\u00edvel visualizar, de melhor maneira, suas necessidades e eventuais problemas.<\/span><\/p>\n<h2><strong>Principais metodologias de gest\u00e3o \u00e1gil<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">Existem diversas metodologias que podem ser aplic\u00e1veis \u00e0 gest\u00e3o \u00e1gil e din\u00e2mica dos projetos de uma empresa.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Dentre as principais est\u00e3o a gest\u00e3o \u00e1gil Scrum, Kanban, Lean, Nexus e outras. Assim, \u00e9 poss\u00edvel adaptar v\u00e1rias delas ao conceito de entregas menores e mais frequentes.<\/span><\/p>\n<h2><strong>Como fazer uma gest\u00e3o \u00e1gil de projetos?<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">Existem algumas fases que s\u00e3o cruciais ao colocar a gest\u00e3o \u00e1gil em pr\u00e1tica dentro da sua empresa. Conhe\u00e7a as principais.<\/span><\/p>\n<h3><strong>Documente o planejamento e suas inten\u00e7\u00f5es<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">O primeiro passo para colocar em pr\u00e1tica a gest\u00e3o \u00e1gil de projetos \u00e9 promover a documenta\u00e7\u00e3o do planejamento.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Isto \u00e9, registrar as expectativas e resultados esperados; igualmente, quais ser\u00e3o as abordagens e as formas delas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Assim, nesse ponto a empresa pode determinar quem ser\u00e3o os respons\u00e1veis pela implementa\u00e7\u00e3o da nova gest\u00e3o. Igualmente, os prazos e as atividades necess\u00e1rias.<\/span><\/p>\n<h3><strong>Treine seu time<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">O segundo passo para implementar a gest\u00e3o \u00e1gil de projetos na sua empresa \u00e9 fazer o treinamento dos colaboradores envolvidos no desenvolvimento destes projetos.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00c9 importante que os colaboradores entendam o porqu\u00ea da adapta\u00e7\u00e3o no m\u00e9todo de gest\u00e3o. Os benef\u00edcios que ela trar\u00e1, bem como o funcionamento dela.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ainda, treine seu time para que ele saiba como responder \u00e0s mudan\u00e7as de maneira natural e produtiva.<\/span><\/p>\n<h3><strong>Treine o cliente<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">N\u00e3o \u00e9 importante treinar apenas a equipe, mas tamb\u00e9m o cliente! Ele deve ser orientado sobre como as entregas dos projetos que se voltam a ele ocorrer\u00e3o dali para frente.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Afinal, no lugar de uma \u00fanica entrega, a gest\u00e3o \u00e1gil de projetos envolve entregas constantes e o cliente deve estar preparado para isso.<\/span><\/p>\n<h3><strong>Metodologia e projeto-piloto<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">Por fim, n\u00e3o deixe de determinar uma metodologia (como gest\u00e3o \u00e1gil Scrum ou Nexus) para aplicar essa mudan\u00e7a.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Igualmente, tenha um projeto-piloto para fins de implementa\u00e7\u00e3o das mudan\u00e7as na gest\u00e3o, que ajuda tanto no treinamento quanto na compreens\u00e3o das novas regras.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A gest\u00e3o \u00e1gil de projetos \u00e9 uma maneira especial de executar e gerenciar o desenvolvimento de novos projetos nas empresas. O foco dela \u00e9 a flexibilidade, a integra\u00e7\u00e3o, a rapidez e a din\u00e2mica. Aqui, deixa-se de lado o conceito de que a defini\u00e7\u00e3o do projeto ocorre, inteiramente, antes de sua execu\u00e7\u00e3o. Mas como ela funciona [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":36119,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[17677],"tags":[17927,11386,11124,17928,11385],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.2 (Yoast SEO v22.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar? | Oitchau<\/title>\n<meta name=\"description\" content=\"A gest\u00e3o \u00e1gil de projetos \u00e9 uma metodologia que possibilita entregas mais organizadas e r\u00e1pidas para projetos de curto, m\u00e9dio e longo prazo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?\" \/>\n<meta property=\"og:description\" content=\"A gest\u00e3o \u00e1gil de projetos \u00e9 uma metodologia que possibilita entregas mais organizadas e r\u00e1pidas para projetos de curto, m\u00e9dio e longo prazo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\" \/>\n<meta property=\"og:site_name\" content=\"Controle de Ponto &amp; Timesheets\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/oitchaubr\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-10T20:02:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-26T19:54:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1982\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Aline Mesquita\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@oitchaubr\" \/>\n<meta name=\"twitter:site\" content=\"@oitchaubr\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Aline Mesquita\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":[\"Article\",\"BlogPosting\"],\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\"},\"author\":{\"name\":\"Aline Mesquita\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/person\/40ba65f8664531ffe1465f6cb9d82430\"},\"headline\":\"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?\",\"datePublished\":\"2022-11-10T20:02:44+00:00\",\"dateModified\":\"2024-08-26T19:54:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\"},\"wordCount\":1145,\"publisher\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png\",\"keywords\":[\"gest\u00e3o \u00e1gil de projetos\",\"gest\u00e3o de projetos\",\"Kanban\",\"projetos \u00e1geis\",\"scrum\"],\"articleSection\":[\"Gest\u00e3o de Projetos\"],\"inLanguage\":\"pt-BR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\",\"url\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\",\"name\":\"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar? | Oitchau\",\"isPartOf\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png\",\"datePublished\":\"2022-11-10T20:02:44+00:00\",\"dateModified\":\"2024-08-26T19:54:31+00:00\",\"description\":\"A gest\u00e3o \u00e1gil de projetos \u00e9 uma metodologia que possibilita entregas mais organizadas e r\u00e1pidas para projetos de curto, m\u00e9dio e longo prazo.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage\",\"url\":\"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png\",\"contentUrl\":\"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png\",\"width\":1982,\"height\":800,\"caption\":\"gest\u00e3o \u00e1gil de projetos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/www.oitchau.com.br\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#website\",\"url\":\"https:\/\/www.oitchau.com.br\/blog\/\",\"name\":\"Controle de Ponto & Timesheets\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.oitchau.com.br\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#organization\",\"name\":\"Oitchau\",\"url\":\"https:\/\/www.oitchau.com.br\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/storage.googleapis.com\/oitchaublog\/2024\/03\/a0e65c6f-design-sem-nome-20.png\",\"contentUrl\":\"https:\/\/storage.googleapis.com\/oitchaublog\/2024\/03\/a0e65c6f-design-sem-nome-20.png\",\"width\":696,\"height\":696,\"caption\":\"Oitchau\"},\"image\":{\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/oitchaubr\/\",\"https:\/\/twitter.com\/oitchaubr\",\"https:\/\/instagram.com\/oitchaubr\"],\"description\":\"A Oitchau \u00e9 uma solu\u00e7\u00e3o completa para gest\u00e3o de tempo dos colaboradores, atrav\u00e9s de suas solu\u00e7\u00f5es de controle de ponto & timesheets, ela permite que gestores, RH e DP possam gerenciar desde a jornada de trabalho de funcion\u00e1rios at\u00e9 a gest\u00e3o de tempo em projetos. Elevando o n\u00edvel estrat\u00e9gico do neg\u00f3cio de forma inteligente e assertiva, potencializando seus resultados e garantindo compliance com a Lei.\",\"email\":\"contato@oitchau.com.br\",\"telephone\":\"+551142102846\",\"foundingDate\":\"2016-01-01\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"51\",\"maxValue\":\"200\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/person\/40ba65f8664531ffe1465f6cb9d82430\",\"name\":\"Aline Mesquita\",\"url\":\"https:\/\/www.oitchau.com.br\/blog\/author\/aline\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar? | Oitchau","description":"A gest\u00e3o \u00e1gil de projetos \u00e9 uma metodologia que possibilita entregas mais organizadas e r\u00e1pidas para projetos de curto, m\u00e9dio e longo prazo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/","og_locale":"pt_BR","og_type":"article","og_title":"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?","og_description":"A gest\u00e3o \u00e1gil de projetos \u00e9 uma metodologia que possibilita entregas mais organizadas e r\u00e1pidas para projetos de curto, m\u00e9dio e longo prazo.","og_url":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/","og_site_name":"Controle de Ponto &amp; Timesheets","article_publisher":"https:\/\/www.facebook.com\/oitchaubr\/","article_published_time":"2022-11-10T20:02:44+00:00","article_modified_time":"2024-08-26T19:54:31+00:00","og_image":[{"width":1982,"height":800,"url":"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png","type":"image\/png"}],"author":"Aline Mesquita","twitter_card":"summary_large_image","twitter_creator":"@oitchaubr","twitter_site":"@oitchaubr","twitter_misc":{"Written by":"Aline Mesquita","Est. reading time":"6 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":["Article","BlogPosting"],"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#article","isPartOf":{"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/"},"author":{"name":"Aline Mesquita","@id":"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/person\/40ba65f8664531ffe1465f6cb9d82430"},"headline":"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?","datePublished":"2022-11-10T20:02:44+00:00","dateModified":"2024-08-26T19:54:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/"},"wordCount":1145,"publisher":{"@id":"https:\/\/www.oitchau.com.br\/blog\/#organization"},"image":{"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage"},"thumbnailUrl":"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png","keywords":["gest\u00e3o \u00e1gil de projetos","gest\u00e3o de projetos","Kanban","projetos \u00e1geis","scrum"],"articleSection":["Gest\u00e3o de Projetos"],"inLanguage":"pt-BR"},{"@type":"WebPage","@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/","url":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/","name":"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar? | Oitchau","isPartOf":{"@id":"https:\/\/www.oitchau.com.br\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage"},"image":{"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage"},"thumbnailUrl":"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png","datePublished":"2022-11-10T20:02:44+00:00","dateModified":"2024-08-26T19:54:31+00:00","description":"A gest\u00e3o \u00e1gil de projetos \u00e9 uma metodologia que possibilita entregas mais organizadas e r\u00e1pidas para projetos de curto, m\u00e9dio e longo prazo.","breadcrumb":{"@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#primaryimage","url":"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png","contentUrl":"https:\/\/storage.googleapis.com\/oitchaublog\/2022\/11\/ce086863-gestao-agil-de-projetos.png","width":1982,"height":800,"caption":"gest\u00e3o \u00e1gil de projetos"},{"@type":"BreadcrumbList","@id":"https:\/\/www.oitchau.com.br\/blog\/gestao-agil-de-projetos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/www.oitchau.com.br\/blog\/"},{"@type":"ListItem","position":2,"name":"Gest\u00e3o \u00e1gil de projetos: o que \u00e9 e como aplicar?"}]},{"@type":"WebSite","@id":"https:\/\/www.oitchau.com.br\/blog\/#website","url":"https:\/\/www.oitchau.com.br\/blog\/","name":"Controle de Ponto & Timesheets","description":"","publisher":{"@id":"https:\/\/www.oitchau.com.br\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.oitchau.com.br\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/www.oitchau.com.br\/blog\/#organization","name":"Oitchau","url":"https:\/\/www.oitchau.com.br\/blog\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/storage.googleapis.com\/oitchaublog\/2024\/03\/a0e65c6f-design-sem-nome-20.png","contentUrl":"https:\/\/storage.googleapis.com\/oitchaublog\/2024\/03\/a0e65c6f-design-sem-nome-20.png","width":696,"height":696,"caption":"Oitchau"},"image":{"@id":"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/oitchaubr\/","https:\/\/twitter.com\/oitchaubr","https:\/\/instagram.com\/oitchaubr"],"description":"A Oitchau \u00e9 uma solu\u00e7\u00e3o completa para gest\u00e3o de tempo dos colaboradores, atrav\u00e9s de suas solu\u00e7\u00f5es de controle de ponto & timesheets, ela permite que gestores, RH e DP possam gerenciar desde a jornada de trabalho de funcion\u00e1rios at\u00e9 a gest\u00e3o de tempo em projetos. Elevando o n\u00edvel estrat\u00e9gico do neg\u00f3cio de forma inteligente e assertiva, potencializando seus resultados e garantindo compliance com a Lei.","email":"contato@oitchau.com.br","telephone":"+551142102846","foundingDate":"2016-01-01","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"51","maxValue":"200"}},{"@type":"Person","@id":"https:\/\/www.oitchau.com.br\/blog\/#\/schema\/person\/40ba65f8664531ffe1465f6cb9d82430","name":"Aline Mesquita","url":"https:\/\/www.oitchau.com.br\/blog\/author\/aline\/"}]}},"_links":{"self":[{"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/posts\/26657"}],"collection":[{"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/comments?post=26657"}],"version-history":[{"count":2,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/posts\/26657\/revisions"}],"predecessor-version":[{"id":36120,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/posts\/26657\/revisions\/36120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/media\/36119"}],"wp:attachment":[{"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/media?parent=26657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/categories?post=26657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oitchau.com.br\/blog\/wp-json\/wp\/v2\/tags?post=26657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}